UPPERTONEQUICK ASSEMBLY MANUALGPK Inc.535 Floyd Smith Dr.El Cajon, CA 92020800-468-8649 (USA & Canada)619-593-7381; 619-593-7514 (Fax)
Quick Assembly Instructions:We fully assemble and test the UPPERTONE, then minimally disassemble it before shipping it you.We describe the re-assembly
B. Crankshaft Assembly (Figures 4 & 5)1. Slide the Deltoid/Lat Slider (6) down the Frame Post (3) (Figure 4). The pulleys should face the insideo
2"-3"GapFigure 9D. Rowing Lever Assembly (Figure 7)1. Cut the plastic zip ties on the Frame Legs (2) where the Rowing Levers (5) are to be
the regular nut so that it is inside theFrame Post. Slide the Hook Boltthrough the second hole in theFrame Post, then thread and tightenthe Lock Nut.2
QUICK ASSEMBLY MANUAL PARTS LIST Part No. Description Qty1. Main Frame 12. Frame Base 23. Frame Post 14. Weight Track 25.
Comments to this Manuals